B&R Automation X20CP1586 CPU Module – X20 Series
B&R X20CP1586 is listed for X20 Series RFQ review. Confirm quantity, condition and destination before quotation.
Model: X20BT9100
Product Overview
Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.
Datasheet Preview
Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.
Commercial Path
Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.
Technical Dossier
The B&R X20BT9100 is a dedicated X2X Link bus transmitter within the X20 modular I/O system — a backbone communication component that synchronizes real-time data exchange between X20 CPU nodes and distributed I/O modules. In facilities running B&R-based automation (packaging lines, press systems, material handling, food & beverage processing), a single failed X20BT9100 can halt an entire production segment. This is not a peripheral accessory; it is a load-bearing node in your control architecture.
| Part Number | X20BT9100 |
| Manufacturer | B&R Industrial Automation (Austria) |
| Series | X20 System |
| Function | X2X Link Bus Transmitter |
| Communication Protocol | X2X Link (proprietary B&R real-time bus) |
| Supply Voltage | 24 VDC (via X20 backplane) |
| Operating Temperature | 0°C to +55°C |
| Mounting | X20 DIN rail system, snap-fit |
| Country of Origin | Austria |
| RFQ terms review | Commercial terms are confirmed during RFQ review based on model, condition, documentation, quantity and destination. |
| Project RFQ support | Multi-unit and mixed-model requirements can be reviewed as one RFQ with sourcing options confirmed before quotation. |
| Condition | New original / Tested surplus (specified at quotation) |
Procurement decisions on automation spares are rarely just about unit price. The true cost of sourcing the X20BT9100 must account for three variables:
Q: How are RFQ terms confirmed?
A: Quantity, required condition, documentation needs, destination and sourcing route are confirmed during RFQ review before quotation.
Part Number Verification & Cross-Reference: Our technical team validates every order against B&R's official part number taxonomy to prevent costly mis-shipments. If your BOM lists a superseded or variant SKU, we identify the correct current equivalent before fulfillment.
Continue The Model Path
Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.