B&R X20CP1382 I/O Processor Module: Specs, Compatible SKUs & Availability
B&R X20 System Series: Comprehensive Module Range and Technical Overview The B&R X20 System is a modular I/O and control…
Model: 5PC810.SX01-00
Product Overview
Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.
Datasheet Preview
Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.
Commercial Path
Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.
Technical Dossier
The B&R 5PC810.SX01-00 is a fanless industrial panel PC from B&R's Automation Generation 3 (APC810) platform, engineered for demanding machine automation environments. As B&R has transitioned its hardware roadmap toward newer generations, sourcing a verified replacement unit for an installed APC810-based system has become a measurable procurement risk. A single unplanned line stoppage caused by a failed HMI/controller unit can cost a mid-size manufacturer between USD 50,000 and USD 500,000 per day in lost output, rework, and contractual penalties. Securing a qualified spare before failure occurs is not a discretionary budget item — it is a risk mitigation decision.
| Attribute | Detail |
|---|---|
| Manufacturer | B&R (Bernecker + Rainer Industrie-Elektronik GmbH) |
| Part Number | 5PC810.SX01-00 |
| Series | Automation Generation 3 – APC810 |
| Form Factor | Fanless Industrial Panel PC |
| Country of Origin | Austria |
| Product Status | Discontinued / End-of-Life (EOL) – Legacy stock available |
| Typical Application | Machine HMI, CNC control, packaging automation, press control |
| Compatible Systems | B&R APC810 platform; integrates with B&R Automation Studio, POWERLINK, X2X Link |
| Inventory Status | Limited legacy stock – subject to availability |
| Lead Time | In-stock units: 3–7 business days; sourced units: 2–4 weeks (confirmed at RFQ stage) |
| Warranty | 12 months from shipment date |
Procurement managers evaluating the 5PC810.SX01-00 are typically facing one of two scenarios: a reactive replacement after unit failure, or a proactive spare-parts strategy to protect uptime. The TCO calculation differs significantly between the two.
Reactive replacement cost model: When a panel PC fails without a spare on hand, the procurement team must source the unit under time pressure — accepting inflated spot-market pricing, expedited freight surcharges, and potential line downtime measured in days rather than hours. Engineering time to re-validate a substitute unit, if the exact model is unavailable, adds further cost. In B&R APC810-based systems, the controller and HMI are tightly integrated; substituting a different hardware generation often requires Automation Studio project migration, which carries both engineering cost and commissioning risk.
Proactive spare strategy: Holding one or two verified 5PC810.SX01-00 units as on-site spares reduces mean time to repair (MTTR) from days to under two hours. At a unit cost that represents a fraction of a single day's downtime loss, the payback period on a proactive spare is typically measured in weeks, not years. DriveKNMS offers volume pricing for customers building multi-site spare pools, with consolidated invoicing to simplify accounts payable processing.
Spare parts turnover rate: For EOL hardware, the market supply of verified units contracts over time. Procurement teams that delay sourcing face both higher unit prices and longer lead times as distributor stock depletes. Locking in pricing now through a confirmed purchase order or a blanket order agreement is a straightforward way to control future maintenance costs.
Sourcing network depth: DriveKNMS maintains active relationships with industrial surplus dealers, OEM channel partners, and factory-authorized refurbishers across Europe, North America, and Asia. For EOL B&R hardware, this network is the practical alternative to waiting on OEM back-order queues that may never be fulfilled.
Part number verification: B&R uses a structured part numbering system where suffix codes denote hardware revision, memory configuration, and interface options. Our technical team cross-references the customer's existing unit label against the B&R hardware revision database before confirming compatibility — reducing the risk of receiving a functionally incompatible unit.
Financial compliance: All transactions are conducted with formal purchase orders, VAT-compliant invoices, and traceable payment records. For enterprise procurement teams subject to internal audit requirements, this documentation trail is non-negotiable. We provide it as standard.
Repeat order management: Customers with ongoing maintenance programs can register their installed base with DriveKNMS. We monitor market availability of their critical spare part numbers and provide advance notification when stock levels tighten — giving procurement teams lead time to act before prices spike.
Q: What are the payment terms?
A: Standard terms are 100% T/T in advance for first-time orders. Established customers with verified credit history may qualify for net-30 terms. L/C at sight is accepted for orders above USD 10,000.
Q: Are units new or refurbished?
A: Stock condition is confirmed at the RFQ stage and disclosed on the quotation. We supply new-in-box (NIB), new surplus (unused, original packaging), and professionally refurbished units. Refurbished units are tested to functional specification and carry the same 12-month warranty as new stock.
Q: Can we place a blanket order for multiple units?
A: Yes. Blanket orders with scheduled releases are accepted. Volume pricing applies at quantities of 3 units or more. Contact us to discuss a supply agreement tailored to your maintenance schedule.
Q: What is the return policy?
A: Units that arrive with shipping damage or are found to be non-functional on arrival (DOA) are replaced or refunded within 14 days of delivery. Warranty claims after installation are handled through our RMA process with a 48-hour response commitment.
Q: How do you handle export controls?
A: We screen all orders against applicable export control lists prior to shipment. End-user declarations are required for controlled destinations. Our logistics team manages all customs documentation to ensure compliant clearance.