B&R 80PS080X3.10-01 Power Supply Module – Obsolete Automation Series Spare Part
B&R 80PS080X3.10-01 is listed for Power Supplies RFQ review. Confirm quantity, condition and destination before quotation.
Model: 8BOP0220HC00.001-1
Product Overview
Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.
Datasheet Preview
Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.
Commercial Path
Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.
Technical Dossier
RFQ support for obsolete parts: Send the model number, required quantity and destination so DriveKNMS can confirm sourcing options before quotation.
| Part Number | 8BOP0220HC00.001-1 |
| Manufacturer | B&R Automation (Bernecker & Rainer) |
| Series | X20 System |
| Module Type | Bus Power Supply Module |
| Country of Origin | Austria |
| Availability Status | Discontinued / Constrained – RFQ availability review at DriveKNMS |
| Compatible Systems | B&R X20 PLC/Controller Backplane Infrastructure |
Note: Electrical parameters (voltage input/output, current rating) for this specific revision are not published here to avoid inaccuracy. Please contact us directly for confirmed datasheet documentation prior to installation.
The B&R X20 platform has been deployed across thousands of production facilities worldwide — automotive assembly, food processing, pharmaceutical packaging, and discrete manufacturing. Many of these installations represent capital investments of several million dollars in engineering, commissioning, and process validation. Replacing the control architecture is not a maintenance decision; it is a capital project requiring budget approval, system redesign, software migration, and revalidation — a process that routinely takes 18 to 36 months and costs far more than the original installation.
Facilities operating legacy B&R X20 systems face a structural challenge: the manufacturer's support lifecycle does not align with the economic lifecycle of the installed equipment. The following approach has been used by maintenance teams to extend operational life without triggering a full system replacement:
1. Critical Spare Identification: Audit the X20 configuration and identify single points of failure — modules with no redundancy and no available substitute. Power supply modules, CPU modules, and communication interfaces typically top this list. Procure at least one spare of each before they become unavailable.
2. Condition-Based Monitoring: Electrolytic capacitors inside power supply modules have a finite service life, typically 10–15 years under normal operating temperatures. Implement thermal monitoring on control cabinets and schedule proactive replacement of power supply modules before failure, not after.
3. Firmware Version Control: Document the firmware revision running on every X20 CPU and communication module. When sourcing replacement hardware, confirm the firmware version matches your validated configuration. Mismatched firmware can cause compatibility issues that are difficult to diagnose under pressure.
5. Lifecycle Documentation: Maintain a living document of every module's installation date, part number, revision, and replacement history. This record becomes essential when sourcing replacements and when making the eventual case to management for a planned migration versus emergency replacement.
These five practices, applied consistently, have allowed facilities to operate legacy B&R X20 systems reliably for 5 to 10 years beyond the manufacturer's stated support window — without the cost and disruption of a forced system upgrade.
Every 8BOP0220HC00.001-1 unit shipped by DriveKNMS passes through a structured 5-step inspection protocol before dispatch:
Step 1 – Visual and Mechanical Inspection: Full examination of housing integrity, connector pins, and PCB surface. Units with physical damage, corrosion, or pin deformation are rejected at this stage.
Step 2 – Electrolytic Capacitor Assessment: Capacitor condition is evaluated for signs of bulging, electrolyte leakage, or ESR degradation — the most common failure mode in aged power supply modules.
Step 3 – Firmware Version Verification: Where accessible, firmware revision is documented and disclosed to the buyer prior to shipment.
Step 4 – Pin and Contact Integrity Check: Backplane connector pins are inspected for oxidation, mechanical deformation, and contact resistance. Corroded contacts are a known cause of intermittent faults in legacy X20 installations.
Step 5 – Functional Verification: Units are powered and checked for basic operational response where test infrastructure permits. Results are documented per unit.
Drop-in Replacement: The 8BOP0220HC00.001-1 installs directly into the existing X20 backplane slot. No hardware modification, no rewiring, and no PLC reprogramming is required. The control system recognizes the module on power-up without engineering intervention.
No Software Migration: Unlike a system upgrade, replacing this module does not require changes to the application program, I/O mapping, or HMI configuration. Maintenance staff can execute the replacement during a planned shutdown window without specialist engineering support.
Cost Containment: The cost of sourcing this spare module is a small fraction of the engineering cost associated with redesigning the power distribution architecture for a newer platform. For facilities under budget pressure, this is the lowest-cost path to continued operation.
Q: How do I confirm the unit is genuine and not counterfeit?
A: All units are sourced through traceable industrial channels. We provide documentation of origin where available and disclose the full condition history of each unit. We do not source from unverified consumer markets.
Q: Should I purchase more than one unit?
A: For any module that is confirmed discontinued, purchasing a minimum of two units is a standard risk management practice. One unit goes into service; one unit goes onto the shelf. Given the unpredictable availability of discontinued components, waiting until the first spare fails before sourcing a second is a significant operational risk.
Q: Can you source other B&R X20 modules we need?
A: Yes. DriveKNMS specializes in hard-to-find industrial automation components across multiple brands and platforms. Send us your full bill of materials and we will advise on availability.
Continue The Model Path
Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.