ALSTOM MVAJ105RA0802A Protection Relay – MiCOM Series
Alstom MVAJ105RA0802A is listed for MiCOM Series RFQ review. Confirm quantity, condition and destination before quotation.
Model: 3402087500 34020874XD-1EA 34020874XD-8EA
Product Overview
Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.
Datasheet Preview
Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.
Commercial Path
Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.
Technical Dossier
DriveKNMS maintains verified inventory of this discontinued Digit Board specifically to protect manufacturers from that scenario. Securing a spare now is not a procurement luxury — it is a risk management decision.
RFQ support for obsolete parts: Send the model number, required quantity and destination so DriveKNMS can confirm sourcing options before quotation.
Note: Electrical parameters for this discontinued model are not publicly documented in current manufacturer datasheets. DriveKNMS technicians perform physical verification on each unit prior to shipment. Fabricated specifications are never published.
For a plant still running on this architecture, the options narrow quickly: source a verified spare from a specialist distributor, or face a forced system migration. A forced migration on an unplanned timeline is among the most expensive decisions a plant manager can make. Engineering redesign, new PLC programming, operator retraining, process revalidation, and regulatory re-approval — each of these line items compounds the total cost. Conservative estimates for a full legacy system replacement in a mid-size manufacturing facility start at several hundred thousand dollars and can exceed seven figures for complex, multi-loop control environments.
Q: How is condition confirmed before quotation?
A: Available condition, photos, test records and documentation are checked according to the requested model and sourcing channel before a formal RFQ response.
Q: Can you support multi-unit or repeat RFQ requests?
A: Yes. Send the model list, target quantity and destination so DRIVEKNMS can review sourcing options and quote the requirement as a project RFQ.
Q: How are RFQ terms confirmed?
A: Quantity, required condition, documentation needs, destination and sourcing route are confirmed during RFQ review before quotation.
Continue The Model Path
Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.