GE DS200TCRAG1ABB Relay Output Board – Obsolete Mark VI Spare Part

Model: DS200TCRAG1ABB

Series Mark VI
Model DS200TCRAG1ABB
RFQ-ready model route Obsolete and surplus sourcing Export follow-up by model list

Product Overview

Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.

Datasheet Preview

Datasheet Preview

Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.

Request Full Manual

Commercial Path

Use This Page To Confirm The Model, Then Move To RFQ

Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.

Technical Dossier

Product Details And Specifications

GE DS200TCRAG1ABB Relay Output Board – Obsolete Mark VI Spare Part

RFQ support for obsolete parts: Send the model number, required quantity and destination so DriveKNMS can confirm sourcing options before quotation.

Technical Specifications

Part Number DS200TCRAG1ABB
Manufacturer GE (General Electric)
Series Mark VI Turbine Control System
Function Relay Output Board
Country of Origin United States
Product Status Discontinued / Obsolete – No longer manufactured by GE
Compatible Systems GE Mark VI, Mark V (selected configurations)
Typical Application Gas turbine, steam turbine, and combined-cycle plant control panels

Note: Electrical parameters not confirmed from verified datasheets are intentionally omitted. DriveKNMS does not publish unverified specifications.

Solving the Discontinued Hardware Crisis

GE discontinued the Mark VI product line, and with it, the supply chain for boards like DS200TCRAG1ABB collapsed. Yet tens of thousands of turbines globally still run on Mark VI architecture. The relay output board governs discrete output signals — trip commands, valve actuations, alarm relays — that are hardwired into the plant's safety and operational logic. There is no software patch that replaces a failed relay board. There is no firmware update that compensates for a burned output channel.

Plant managers facing this reality have two options: source the original board from a specialist supplier, or commit to a full control system upgrade. The upgrade path, when fully costed — including new I/O wiring, engineering hours, operator retraining, and production loss during cutover — rarely comes in under seven figures for a mid-sized turbine installation. The DS200TCRAG1ABB, sourced from a verified inventory like DriveKNMS, eliminates that cost entirely and restores the turbine to service within days, not months.

For facilities operating multiple turbines on Mark VI, maintaining a strategic spare inventory of relay output boards is not a procurement luxury — it is a risk management decision. A single unplanned outage on a 100MW gas turbine can cost more per day than an entire shelf of spare boards.

How to extend your GE Mark VI asset life by 5–10 years through targeted spare parts management:

Condition & Reliability Assurance

Every DS200TCRAG1ABB unit that leaves DriveKNMS has passed a structured 5-step quality process developed specifically for obsolete industrial control hardware:

  1. Electrolytic Capacitor Inspection: Capacitor aging is the primary failure mode in boards of this vintage. Each unit is inspected for bulging, leakage, and ESR deviation. Boards with suspect capacitors are either recapped with equivalent-spec components or rejected from inventory.
  2. Firmware Version Verification: Where firmware is embedded, the revision level is documented and disclosed. Customers are advised of any revision differences relative to their installed base before dispatch review.
  3. Pin and Connector Corrosion Check: Edge connectors and I/O pins are inspected under magnification for oxidation, pitting, and mechanical damage. Affected contacts are treated or the board is rejected.
  4. Relay Actuation Test: Each relay output channel is cycled and verified for correct actuation, release, and contact resistance. This step is non-negotiable for relay output boards.
  5. Final Functional Burn-In: Boards are powered and monitored under controlled conditions before packaging. Any latent failure that would appear within the first hours of operation is caught at this stage, not at your facility.

Key Features for System Maintenance

  • Drop-in replacement: DS200TCRAG1ABB installs directly into the existing Mark VI chassis with no mechanical modification required.
  • No reprogramming required: The relay output board does not carry application logic. Replacement does not require a controls engineer or a GE service contract.
  • No engineering redesign: Unlike a platform migration, swapping this board preserves all existing wiring, I/O assignments, and HMI configurations. The plant returns to its pre-failure state, not a new configuration that requires revalidation.
  • Immediate operational restoration: With a verified spare on-site, mean time to repair is measured in hours. Without one, it is measured in weeks — or months, depending on global sourcing conditions.

Q: How are RFQ terms confirmed?
A: Quantity, required condition, documentation needs, destination and sourcing route are confirmed during RFQ review before quotation.

Q: What if my installed board has a different hardware revision?
A: Advise us of your current board's revision marking when you inquire. We will confirm compatibility before confirming the order.

Continue The Model Path

Use system, brand and series routes to compare related published models.

Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.

WhatsApp Prefilled Inquiry Email sale@driveknms.com Phone +86 18359293191 Top Back To Top