GE Fanuc IS200TBCIS2CCD I/O Terminal Board – Mark VI Redundant Control System
GE Fanuc IS200TBCIS2CCD is listed for Mark VI RFQ review. Confirm quantity, condition and destination before quotation.
Model: IS200SSCAH2AGD
Product Overview
Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.
Datasheet Preview
Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.
Commercial Path
Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.
Technical Dossier
DriveKNMS maintains RFQ-reviewed sourcing status of the IS200SSCAH2AGD. For plant managers operating legacy Mark VI installations, this is not a commodity purchase — it is an asset protection decision.
RFQ support for obsolete parts: Send the model number, required quantity and destination so DriveKNMS can confirm sourcing options before quotation.
| Parameter | Detail |
|---|---|
| Part Number | IS200SSCAH2AGD |
| Manufacturer | GE (General Electric) |
| Series | Mark VI Turbine Control System |
| Function | Communication I/O Terminal Board |
| Country of Origin | United States |
| OEM Status | Discontinued / Obsolete – No longer manufactured by GE |
| Compatible Systems | GE Mark VI, Mark VIe (verify revision compatibility before installation) |
| Typical Application | Gas turbine, steam turbine, and combined-cycle plant control panels |
Note: Electrical parameters not independently verified. Specifications above are based on publicly documented GE Mark VI platform data. Buyers are advised to cross-reference with their system documentation prior to installation.
GE's Mark VI control system was the industry standard for turbine management through the 1990s and 2000s. Thousands of units remain in active service globally, yet GE ceased manufacturing replacement boards years ago. The IS200SSCAH2AGD sits at the communication layer of the Mark VI architecture — it handles I/O signal routing between the turbine's physical instrumentation and the control processor. Without a functioning board in this slot, the control system loses visibility into critical process variables. There is no software patch, no firmware workaround, and no cross-compatible substitute from the current GE product line.
Plant operators facing this failure have two options: source an original IS200SSCAH2AGD from the secondary market, or commit to a full control system upgrade. The upgrade path, while sometimes necessary, carries a project timeline of 12–36 months and requires a full plant outage for cutover. For facilities with contractual power delivery obligations or continuous process requirements, that timeline is operationally unacceptable.
Sourcing a verified IS200SSCAH2AGD extends the operational life of the existing Mark VI installation without any changes to the control logic, HMI configuration, or operator training requirements. For facilities that have already invested in Mark VI expertise — certified technicians, calibrated test equipment, documented procedures — preserving that investment through targeted spare parts procurement is the lowest-risk, lowest-cost path forward.
How to extend your Mark VI system life by 5–10 years through strategic spare parts management:
DriveKNMS applies a structured 5-step quality process to all obsolete boards before dispatch review:
Q: How do I confirm the unit is genuine and not a counterfeit?
A: All units are sourced through documented supply channels. Physical markings, board revision codes, and GE part number labels are verified as part of our intake process. We do not sell units where provenance cannot be established.
Q: Can I order multiple units for long-term spares inventory?
A: Yes. We recommend discussing your long-term requirements directly. For facilities managing multiple Mark VI installations, volume procurement and reserved allocation arrangements are available.
Q: What if my exact revision suffix differs from H2AGD?
A: Revision compatibility within the Mark VI platform varies. Contact us with your full part number and system documentation — we will advise on cross-compatibility or source the specific revision you require.
Continue The Model Path
Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.