ALSTOM MVAJ105RA0802A Protection Relay – MiCOM Series
Alstom MVAJ105RA0802A is listed for MiCOM Series RFQ review. Confirm quantity, condition and destination before quotation.
Model: ATM1850 E2-E3 ATM DSU
Product Overview
Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.
Datasheet Preview
Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.
Commercial Path
Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.
Technical Dossier
The METRODATA ATM1850 E2-E3 ATM DSU Circuit Board is a legacy telecommunications infrastructure component widely deployed in E2/E3 ATM (Asynchronous Transfer Mode) network environments. As global telecom operators phase out ATM-based backbones, this board has transitioned from a standard stocked item to a scarce spare part — meaning procurement teams face real supply continuity risk when a unit fails unexpectedly.
| Brand | METRODATA |
| Model / SKU | ATM1850 E2-E3 ATM DSU |
| Category | ATM DSU Circuit Board |
| Series | ATM1850 |
| Interface | E2 / E3 ATM (8.448 Mbps / 34.368 Mbps) |
| Form Factor | Circuit Board / Card Module |
| Country of Origin | United Kingdom |
| Inventory Status | RFQ availability review — Sourced from Verified Surplus & OEM Channels |
| RFQ terms review | Commercial terms are confirmed during RFQ review based on model, condition, documentation, quantity and destination. |
| Condition review | Available condition, photos, test records and documentation are checked before quotation according to the requested model. |
| Condition | New / Refurbished OEM-Grade (specified per order) |
Q: How are RFQ terms confirmed?
A: Quantity, required condition, documentation needs, destination and sourcing route are confirmed during RFQ review before quotation.
Q: Can you support multi-unit or repeat RFQ requests?
A: Yes. Send the model list, target quantity and destination so DRIVEKNMS can review sourcing options and quote the requirement as a project RFQ.
Continue The Model Path
Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.