Siemens 6SL3130-6AE15-0AB0 SCOM CPCI Board – Obsolete SINAMICS S120 Spare Part

Model: AS00800-10, SCOM-0800 0190-41127 0021-39792 6SL3130-6AE15-0AB0

Brand Siemens
Series SINAMICS
Model AS00800-10, SCOM-0800 0190-41127 0021-39792 6SL3130-6AE15-0AB0
RFQ-ready model route Obsolete and surplus sourcing Export follow-up by model list

Product Overview

Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.

Datasheet Preview

Datasheet Preview

Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.

Request Full Manual

Commercial Path

Use This Page To Confirm The Model, Then Move To RFQ

Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.

Technical Dossier

Product Details And Specifications

Siemens 6SL3130-6AE15-0AB0 SCOM CPCI Board – Obsolete SINAMICS S120 Spare Part

RFQ support for obsolete parts: Send the model number, required quantity and destination so DriveKNMS can confirm sourcing options before quotation.

Technical Specifications

Parameter Detail
Siemens Part Number 6SL3130-6AE15-0AB0
Cross-Reference SKU AS00800-10 / SCOM-0800 / 0190-41127 / 0021-39792
Board Type SCOM CPCI (CompactPCI) Communication Board
Compatible Drive Series Siemens SINAMICS S120
Form Factor CompactPCI (CPCI) — 3U or 6U slot (verify chassis before ordering)
Country of Origin Germany
Product Status Discontinued / Obsolete — No longer manufactured by Siemens
Typical System Context SINAMICS S120 multi-axis drive systems; CU320-2 or CU310-2 Control Unit environments

Note: Electrical parameters not independently verified. Specifications above are derived from cross-reference data. Buyers are advised to confirm compatibility with their specific drive firmware version prior to installation.

Solving the Discontinued Hardware Crisis

The SINAMICS S120 platform was Siemens' flagship multi-axis servo and vector drive architecture for over two decades. Thousands of installations remain in active service across automotive, metals, plastics, and process industries. The SCOM CPCI board handles inter-module communication within the drive cabinet — it is not a peripheral component. Without it, the drive system cannot coordinate axis motion or exchange process data with the higher-level controller.

The practical path for plant engineering teams managing S120 assets is a structured spare parts reserve strategy. Holding one or two verified SCOM boards in bonded storage eliminates the single largest failure risk in the drive cabinet at a fraction of the cost of a system upgrade. DriveKNMS specializes in sourcing, testing, and supplying exactly these components for facilities that cannot afford to treat legacy hardware as a liability.

How to extend your SINAMICS S120 asset life by 5–10 years without a full system upgrade:

Condition & Reliability Assurance

Sourcing obsolete industrial electronics carries inherent risk. DriveKNMS applies a five-step qualification process to every SCOM CPCI board before it leaves our facility:

  • Step 1 – Visual and mechanical inspection: Full examination of the PCB surface, connector pins, and housing for physical damage, corrosion, or evidence of prior repair work. Boards showing unauthorized rework are rejected.
  • Step 2 – Electrolytic capacitor assessment: Capacitors are the primary aging component in boards of this generation. We measure ESR (equivalent series resistance) on all electrolytic capacitors. Boards with out-of-specification capacitors are either recapped by certified technicians or rejected.
  • Step 3 – Firmware version verification: Where accessible, firmware version is read and documented. This information is provided to the buyer to confirm compatibility with their installed CU firmware.
  • Step 4 – Pin and connector integrity check: All edge connectors and backplane pins are inspected under magnification for oxidation, bending, or contamination. Affected contacts are cleaned using approved contact restoration methods.
  • Step 5 – Functional power-on test (where test fixture available): Boards are powered in a controlled bench environment to verify basic initialization. Results are documented and shipped with the unit.

Boards are shipped in anti-static packaging with desiccant. Each shipment includes a condition report.

Key Features for System Maintenance

  • Drop-in replacement: The 6SL3130-6AE15-0AB0 is a direct hardware replacement for the original board position. No cabinet modification is required.
  • No reprogramming required: The SCOM board does not hold application-level parameters. Drive parameters reside on the Control Unit. Board replacement does not require a drive re-commissioning cycle in standard configurations.
  • Avoids engineering reconstruction costs: Replacing a single CPCI board preserves the entire existing drive configuration — wiring, cabinet layout, PLC interface, and HMI integration remain untouched. The cost differential versus a full drive system replacement is measured in orders of magnitude.
  • Supports extended maintenance contracts: Facilities with long-term maintenance obligations on existing equipment can fulfill those obligations without forcing early system retirement.

Can you source other SINAMICS S120 spare parts?
Yes. DriveKNMS maintains an active sourcing network for SINAMICS S120 components including Control Units, power modules, sensor modules, and associated CPCI boards. Contact us with your full BOM requirements.

Continue The Model Path

Use system, brand and series routes to compare related published models.

Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.

WhatsApp Prefilled Inquiry Email sale@driveknms.com Phone +86 18359293191 Top Back To Top