Siemens 2XV9450-1AR23 E10433-E9600-H110 Central Clock Module – SICLOCK TM Plant

Model: 2XV9450-1AR23 E10433-E9600-H110

Brand Siemens
Model 2XV9450-1AR23 E10433-E9600-H110
RFQ-ready model route Obsolete and surplus sourcing Export follow-up by model list

Product Overview

Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.

Datasheet Preview

Datasheet Preview

Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.

Request Full Manual

Commercial Path

Use This Page To Confirm The Model, Then Move To RFQ

Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.

Technical Dossier

Product Details And Specifications

The Siemens SICLOCK TM Plant Central Clock (Part No. 2XV9450-1AR23, Firmware/HW Variant E10433-E9600-H110) is a precision time synchronization master unit designed for industrial plant networks operating on 90–230V AC/DC. As Siemens has progressively phased out legacy SICLOCK hardware in favor of SINEC and SCALANCE-based NTP/PTP solutions, sourcing this specific variant has become a genuine procurement challenge — particularly for facilities running long-lifecycle DCS, SCADA, or PLC architectures that cannot be upgraded on short notice.

Procurement Specifications

Note: Because this part is discontinued, inventory authenticity and traceability documentation are non-negotiable. DriveKNMS provides full chain-of-custody records upon request.

Procurement decisions on legacy industrial components are rarely just about unit price. The true cost of ownership for a time synchronization module like the 2XV9450-1AR23 must account for three dimensions:

We are not a catalog distributor. DriveKNMS operates as an active sourcing agent for industrial automation components, with a specific focus on Siemens, ABB, Schneider Electric, and Rockwell Automation legacy parts.

Q: How are commercial terms confirmed?
A: Commercial terms are confirmed during RFQ review based on model, quantity, destination, documentation and sourcing route.

Q: How are RFQ terms confirmed?
A: Quantity, required condition, documentation needs, destination and sourcing route are confirmed during RFQ review before quotation.

Q: Can you support multi-unit or repeat RFQ requests?
A: Yes. Send the model list, target quantity and destination so DRIVEKNMS can review sourcing options and quote the requirement as a project RFQ.

Continue The Model Path

Use system, brand and series routes to compare related published models.

Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.

WhatsApp Prefilled Inquiry Email sale@driveknms.com Phone +86 18359293191 Top Back To Top