Yokogawa NFAF135-S00 Analog Output Module – Obsolete CENTUM CS/VP Spare Part
Yokogawa NFAF135-S00 is listed for CENTUM CS RFQ review. Confirm quantity, condition and destination before quotation.
Model: NFBU200-S00
Product Overview
Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.
Datasheet Preview
Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.
Commercial Path
Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.
Technical Dossier
RFQ support for obsolete parts: Send the model number, required quantity and destination so DriveKNMS can confirm sourcing options before quotation.
| Part Number | NFBU200-S00 |
| Manufacturer | Yokogawa Electric Corporation |
| Country of Origin | Japan |
| Module Type | Fieldbus Communication Module (H1 Foundation Fieldbus) |
| Compatible Systems | Yokogawa CENTUM CS 3000, CENTUM VP |
| Communication Protocol | Foundation Fieldbus H1 |
| Discontinuation Status | Discontinued / Obsolete – No longer in active production by Yokogawa |
| Form Factor | Plug-in module for CENTUM FCS (Field Control Station) backplane |
Note: Electrical parameters not listed here are not independently verified. DriveKNMS does not publish unconfirmed specifications. Contact us for datasheet documentation.
The NFBU200-S00 serves as the communication bridge between the CENTUM FCS and Foundation Fieldbus H1 field devices — flow meters, pressure transmitters, and control valves that have been calibrated and validated over years of operation. Replacing this module with a modern alternative is not a plug-and-swap exercise. It requires segment topology redesign, device descriptor (DD) file re-validation, and in many cases, a full FCS firmware upgrade that cascades into broader system qualification work.
For facilities running CENTUM CS 3000 or early CENTUM VP installations, the NFBU200-S00 is not a commodity item — it is a load-bearing component of a validated control architecture. Procurement teams that treat it as such, and maintain at least one cold-spare unit on-site, consistently avoid the emergency shutdown scenarios that force unplanned capital expenditure.
Facilities that have extended CENTUM CS 3000 system life by 5 to 10 years beyond Yokogawa's end-of-support date share a common practice: they identified the three to five modules with no modern drop-in replacement and secured multi-unit spares before market availability collapsed. The NFBU200-S00 is consistently on that list. Waiting until a failure event to source this module means competing for the same scarce inventory under time pressure — a position that drives both price and risk upward.
DriveKNMS applies a 5-step inspection protocol to all discontinued modules before dispatch review:
Condition grades (New Surplus, Refurbished, or Used-Tested) are disclosed on the invoice. No unit ships without a documented condition grade.
Q: How do I confirm the unit is genuine and not a counterfeit?
A: All units sourced by DriveKNMS are inspected for Yokogawa OEM markings, label integrity, and PCB construction consistency. We provide photographic documentation of the physical unit upon request before purchase.
Q: Should I purchase more than one unit?
A: For any CENTUM CS 3000 or CENTUM VP installation that is not scheduled for decommissioning within three years, holding a minimum of two NFBU200-S00 units as cold spares is a defensible asset protection strategy. Market availability of this module is declining. Procurement cost today is a fraction of emergency sourcing cost during a production stoppage.
Q: Can DriveKNMS source additional units if I need more than one?
A: Contact us with your quantity requirement. We maintain supplier relationships across multiple regions and can advise on availability timelines.
Continue The Model Path
Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.