Products / Yaskawa / DX200 Controller
Yaskawa DX200 Controller

Yaskawa JZRCR-YPU55-1 DX200 UTSAE-B17CL Power Supply Unit – DX200 Controller

Model: JZRCR-YPU55-1 DX200 UTSAE-B17CL

Brand Yaskawa
Series DX200 Controller
Model JZRCR-YPU55-1 DX200 UTSAE-B17CL
RFQ-ready model route Obsolete and surplus sourcing Export follow-up by model list

Product Overview

Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.

Datasheet Preview

Datasheet Preview

Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.

Request Full Manual

Commercial Path

Use This Page To Confirm The Model, Then Move To RFQ

Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.

Technical Dossier

Product Details And Specifications

Yaskawa JZRCR-YPU55-1 DX200 UTSAE-B17CL Power Supply: Procurement Strategy & Supply Continuity Analysis

The Yaskawa JZRCR-YPU55-1 is the dedicated power supply unit (PSU) for the Yaskawa DX200 robot controller, carrying the board-level designation UTSAE-B17CL. The DX200 controller platform is deployed across automotive body-in-white lines, arc welding cells, material handling systems, and general-purpose industrial robot installations globally. This PSU is a single-point-of-failure component: when it degrades, the entire robot cell goes offline. Lead times from the OEM channel frequently exceed 8–16 weeks during peak demand cycles, making pre-positioned stock a measurable risk mitigation asset for any maintenance team operating DX200-based cells.

Market scarcity assessment: Medium-High. The JZRCR-YPU55-1 is not a commodity item. It is controller-generation-specific and cannot be substituted with DX100 or FS100 PSU variants without hardware and software reconfiguration. Procurement managers sourcing this part should prioritize supply continuity over unit price optimization.

Procurement Specifications

Part Number JZRCR-YPU55-1
Board Designation UTSAE-B17CL
Compatible Controller Yaskawa DX200
Component Type Power Supply Unit (PSU)
Manufacturer Yaskawa Electric Corporation
Country of Origin Japan
Application Industrial Robot Controller – Automotive, Arc Welding, Material Handling
Inventory Status Available – Subject to prior sale; confirm availability via RFQ
Lead Time 3–7 business days (in-stock); 4–10 weeks (sourced-to-order)
Warranty 12 months from date of shipment
Condition New / Refurbished-Tested (specify at time of RFQ)
Export Documentation Commercial Invoice, Packing List, Certificate of Origin available

Cost Optimization & TCO Analysis

Procurement decisions for controller PSUs are rarely about unit price alone. The correct metric is Total Cost of Ownership (TCO), which must account for three variables:

1. Unplanned Downtime Cost. A DX200 controller failure in an automotive stamping or welding line typically generates downtime costs of USD 5,000–25,000 per hour depending on line configuration and OEM penalties. A JZRCR-YPU55-1 sourced at a 15–20% premium over OEM list price, but delivered in 5 days versus 12 weeks, produces a net TCO advantage that is not marginal — it is structural.

2. Spare Parts Turnover Rate. Maintenance teams that carry zero buffer stock on single-source PSUs operate with a parts turnover rate that looks efficient on paper but creates catastrophic exposure during supply disruptions. The recommended buffer for high-utilization DX200 cells is 1 unit per 8–12 controllers, reviewed annually against MTBF data.

3. Sourcing Channel Risk. OEM direct channels offer authenticity guarantees but carry rigid MOQ, fixed lead times, and no flexibility on payment terms. Authorized distributors and specialist suppliers like DriveKNMS provide the same functional outcome with negotiable terms, faster response, and documented traceability — reducing procurement cycle time without increasing compliance risk.

Quality Compliance & Logistics

Every JZRCR-YPU55-1 unit shipped by DriveKNMS undergoes a structured pre-shipment verification process:

  • Visual inspection for physical damage, corrosion, and counterfeit indicators
  • Functional power-on test under load conditions where applicable
  • Comparison against known-good reference units for board-level anomalies
  • Photographic documentation provided upon request before shipment

Logistics: DHL Express, FedEx International Priority, and UPS Worldwide are standard shipping options. Export documentation — including commercial invoice, packing list, and certificate of origin — is prepared in compliance with destination country import requirements. Multi-currency payment is supported: USD, EUR, CNY, HKD. T/T bank transfer, PayPal, and trade finance arrangements available for qualified accounts.

Warranty: 12 months from shipment date. Covers functional failure under normal operating conditions. Does not cover physical damage caused by incorrect installation or electrical surge events outside rated parameters.

Why Procurement Managers Choose DriveKNMS

Search network depth. DriveKNMS maintains active sourcing relationships across Asia-Pacific, Europe, and North America for Yaskawa DX200 components. When a part is not in local stock, our sourcing team initiates parallel searches across verified supplier networks — not a single-vendor dependency.

Part number validation. Cross-referencing JZRCR-YPU55-1 against UTSAE-B17CL and DX200 controller revision history is a standard step in our order processing. We flag mismatches before shipment, not after. This eliminates the most common procurement error: ordering a compatible-looking part that is revision-incompatible with the installed controller firmware version.

Financial compliance. All transactions are issued with formal commercial invoices suitable for corporate accounts payable processing. VAT invoices available for China-based entities. Export licenses and end-user declarations provided where required by destination country regulations.

Repeat order efficiency. Procurement managers who establish an account with DriveKNMS receive dedicated account management, priority allocation on constrained inventory, and consolidated shipping options for multi-line orders.

FAQ

Q: What are the accepted payment terms?
A: Standard terms are 100% T/T in advance for first-time orders. Net-30 and Net-60 terms are available for established accounts with approved credit. PayPal accepted for orders under USD 2,000.

Q: What is the warranty policy if the unit fails on arrival?
A: Dead-on-arrival (DOA) units are replaced or refunded within 7 business days of confirmed failure report. Customer must provide photographic evidence and a written fault description. Return shipping costs are covered by DriveKNMS for confirmed DOA cases.

Q: Can you source the JZRCR-YPU55-1 if it is not currently in stock?
A: Yes. Sourced-to-order lead time is typically 4–10 weeks depending on global availability. We provide a written sourcing confirmation and estimated delivery date before any payment is required.

Q: What is the return process if the part is not compatible?
A: Compatibility disputes must be raised within 14 days of receipt. DriveKNMS will review the installation context and controller revision data. If the error is on our side, full replacement or refund is issued. If the part was ordered against an incorrect specification provided by the buyer, a restocking fee of 15% applies.

WhatsApp Prefilled Inquiry Email [email protected] Phone +86 18359293191 Top Back To Top