Allen-Bradley 2711-K3A2L1 HMI Terminal – Obsolete PanelView 300 Spare Part

Model: 2711-K3A2L1

Series PanelView
Model 2711-K3A2L1
RFQ-ready model route Obsolete and surplus sourcing Export follow-up by model list

Product Overview

Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.

Datasheet Preview

Datasheet Preview

Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.

Request Full Manual

Commercial Path

Use This Page To Confirm The Model, Then Move To RFQ

Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.

Technical Dossier

Product Details And Specifications

Allen-Bradley 2711-K3A2L1 HMI Terminal – Obsolete PanelView 300 Spare Part

RFQ support for obsolete parts: Send the model number, required quantity and destination so DriveKNMS can confirm sourcing options before quotation.

Technical Specifications

Parameter Detail
Part Number 2711-K3A2L1
Manufacturer Allen-Bradley (Rockwell Automation)
Series PanelView 300
Display Type Monochrome
Interface Type Keypad
Communication RS-232 / DH-485
Supply Voltage 24V DC
Country of Origin United States
Discontinuation Status Obsolete – No longer manufactured by Rockwell Automation
Compatible Systems Allen-Bradley SLC 500, PLC-5 series

Note: Only confirmed specifications are listed. No parameters have been estimated or extrapolated.

Solving the Discontinued Hardware Crisis

The PanelView 300 platform was engineered for deterministic, low-overhead operator interaction in discrete manufacturing environments. Its keypad-driven interface, combined with DH-485 network integration, made it the standard HMI choice for SLC 500-based cells throughout the 1990s and 2000s. Rockwell Automation has since discontinued the entire PanelView 300 line, and no direct firmware-compatible successor exists that can be substituted without reprogramming the connected PLC application.

This creates a hard dependency: as long as the SLC 500 or PLC-5 controller remains in service, the PanelView 300 terminal must also remain functional. A failed 2711-K3A2L1 does not just take down an operator station — it disables the human interface layer for the entire cell, halting production until either a replacement terminal is sourced or an emergency engineering project is commissioned to migrate the HMI platform.

For plant managers operating under capital expenditure constraints, the arithmetic is straightforward. Extending the operational life of an existing SLC 500 cell by five to ten years through targeted spare part procurement costs a fraction of the budget required to migrate to a ControlLogix or CompactLogix architecture with a PanelView Plus replacement. The 2711-K3A2L1 is not a legacy curiosity — it is an active asset protection instrument for any facility that has not yet scheduled a full controls modernization.

Condition & Reliability Assurance

Every 2711-K3A2L1 unit processed by DriveKNMS passes a structured five-stage inspection protocol before it is offered for sale:

  • Electrolytic Capacitor Assessment: Age-related capacitor degradation is the primary failure mode in PanelView 300 hardware. Each unit is evaluated for capacitor condition, and units showing ESR drift or physical deformation are rejected.
  • Firmware Version Verification: The installed firmware revision is documented and confirmed compatible with the declared communication protocol configuration.
  • Pin and Connector Inspection: All communication and power connectors are examined under magnification for corrosion, pin deformation, and contact oxidation. Affected units are remediated or rejected.
  • Functional Power-On Test: Each unit is powered and verified to initialize correctly, with display and keypad response confirmed.
  • Cosmetic and Mechanical Check: Housing integrity, keypad tactile response, and label legibility are assessed. Units with structural damage that could affect field installation are excluded from inventory.

Q: How are RFQ terms confirmed?
A: Quantity, required condition, documentation needs, destination and sourcing route are confirmed during RFQ review before quotation.

Key Features for System Maintenance

Q: How is condition confirmed before quotation?
A: Available condition, photos, test records and documentation are checked according to the requested model and sourcing channel before a formal RFQ response.

How do I know the unit is genuine and not counterfeit?
All units are sourced from documented industrial surplus channels. Inspection includes verification of Rockwell Automation part markings, date codes, and board-level construction against known-good references. We do not source from anonymous secondary markets.

Should I buy more than one unit?
For any facility where a PanelView 300 terminal is on the critical path of production, holding a minimum of one cold spare on-site is standard practice. Given declining market availability, procurement teams managing multiple SLC 500 cells should consider consolidating a multi-unit reserve while RFQ-reviewed sourcing status remains accessible.

Can this unit be used with a ControlLogix or CompactLogix controller?
The 2711-K3A2L1 communicates via DH-485 and RS-232 protocols native to the SLC 500 and PLC-5 platforms. It is not designed for EtherNet/IP-based controllers without additional protocol conversion hardware.

Continue The Model Path

Use system, brand and series routes to compare related published models.

Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.

WhatsApp Prefilled Inquiry Email sale@driveknms.com Phone +86 18359293191 Top Back To Top