GE Fanuc IS200TBCIS2CCD I/O Terminal Board – Mark VI Redundant Control System
GE Fanuc IS200TBCIS2CCD is listed for Mark VI RFQ review. Confirm quantity, condition and destination before quotation.
Model: DS200TCEAG1BFF
Product Overview
Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.
Datasheet Preview
Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.
Commercial Path
Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.
Technical Dossier
RFQ support for obsolete parts: Send the model number, required quantity and destination so DriveKNMS can confirm sourcing options before quotation.
| Parameter | Detail |
|---|---|
| Part Number | DS200TCEAG1BFF |
| Manufacturer | GE (General Electric) |
| Series | Mark VI Turbine Control System |
| Function | Emergency Overspeed Protection Board |
| Product Status | Discontinued / Obsolete |
| Compatible Platform | GE Mark VI, Mark VIe (verify application before ordering) |
| Country of Origin | United States |
| Condition Available | New surplus / Tested refurbished (specified at time of order) |
Note: Electrical parameters such as voltage ratings and I/O specifications are board-revision dependent. DriveKNMS will confirm exact revision details upon inquiry. No parameters are published here that cannot be verified — equipment safety depends on it.
GE's Mark VI turbine control platform has been the backbone of gas and steam turbine operations across power generation, oil & gas, and petrochemical facilities for decades. The DS200TCEAG1BFF sits within the turbine's emergency overspeed protection chain — a subsystem that cannot be bypassed, degraded, or substituted with a generic alternative without full system re-engineering.
DriveKNMS operates as a specialized source for exactly this category of hardware. Our inventory is not sourced from liquidation channels without traceability. Each unit passes through a documented inspection process before it is offered for sale.
For plant management teams facing pressure to retire aging Mark VI systems, the financial case for a targeted spare parts program is straightforward. The capital cost of a full turbine control system upgrade — including new hardware, engineering, FAT/SAT testing, and commissioning — typically ranges from several hundred thousand to several million dollars per unit, depending on turbine complexity. A proactive inventory of the ten to fifteen most failure-prone Mark VI boards, including overspeed protection modules like the DS200TCEAG1BFF, can be assembled for a fraction of that figure.
The strategy is not to defer necessary upgrades indefinitely. It is to control the timing of that upgrade on the plant's terms, not on the terms of an unplanned failure. Specific actions that extend Mark VI operational life without compromising safety include: maintaining at least one verified spare of each board in the overspeed and protection circuits; establishing a scheduled inspection cycle for electrolytic capacitor condition on aging boards; and documenting firmware versions across all installed Mark VI racks to ensure replacement boards are sourced at compatible revisions. These measures, applied consistently, have allowed facilities to operate Mark VI platforms reliably well beyond the OEM's stated support window.
Sourcing obsolete industrial control hardware carries inherent risk. DriveKNMS applies a five-step quality process to every DS200TCEAG1BFF unit before it is offered for sale:
How do I know the unit is genuine and not counterfeit?
All units are sourced with documented chain of custody where available. Physical markings, board revision codes, and component dates are cross-referenced against known-good reference data. We do not source from channels where provenance cannot be established.
Should I buy more than one unit?
For any Mark VI installation where the DS200TCEAG1BFF is a single point of failure in the overspeed protection circuit, holding a minimum of one verified spare on-site is a defensible maintenance practice. For facilities with multiple turbines on the same platform, a shared pool of two to three units is a reasonable baseline. Given the declining availability of this part, procurement decisions made today carry more optionality than those made after a failure event.
Can you confirm compatibility with my specific Mark VI configuration before I order?
Yes. Provide your rack configuration and existing board revision, and DriveKNMS will confirm compatibility before the order is placed.
Continue The Model Path
Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.