GE Series 90-30 IC609SJR100C Basic Unit
GE Fanuc IC609SJR100C is listed for Series 90-30 RFQ review. Confirm quantity, condition and destination before quotation.
Model: IC693CMM321-KM
Product Overview
Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.
Datasheet Preview
Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.
Commercial Path
Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.
Technical Dossier
| Part Number | IC693CMM321-KM |
| Brand | GE Fanuc (now part of Emerson / Proficy portfolio) |
| Series | Series 90-30 |
| Module Type | Ethernet Interface / Communication Module |
| Network Speed | 10 Mbps Ethernet (10BASE-T) |
| Protocol Support | SRTP, Modbus TCP, EGD (Ethernet Global Data) |
| Backplane Compatibility | IC693CHS391, IC693CHS392, IC693CHS393 (5/10-slot) |
| Power Consumption | 1.1A @ 5VDC |
| Country of Origin | United States |
| OEM Status | Discontinued — Legacy Spare |
| Inventory Status | RFQ availability review — Subject to Availability |
| RFQ terms review | Commercial terms are confirmed during RFQ review based on model, condition, documentation, quantity and destination. |
| Condition review | Available condition, photos, test records and documentation are checked before quotation according to the requested model. |
Procurement decisions on discontinued PLC modules are rarely straightforward. Here is where most buyers make costly errors — and how DriveKNMS helps you avoid them:
Migration vs. Replacement: If your plant runs multiple Series 90-30 racks, a like-for-like replacement is almost always more cost-effective than a platform migration in the short term. However, if you are managing fewer than 3 active racks, a migration cost analysis to PACSystems RX3i may be warranted. We can provide a comparative cost model on request.
Q: How are RFQ terms confirmed?
A: Quantity, required condition, documentation needs, destination and sourcing route are confirmed during RFQ review before quotation.
Q: Can you support multi-unit or repeat RFQ requests?
A: Yes. Send the model list, target quantity and destination so DRIVEKNMS can review sourcing options and quote the requirement as a project RFQ.
Q: Can you source specific hardware or firmware revisions?
A: We will make every effort to match your revision requirement. Please specify the required revision in your RFQ. If an exact match is unavailable, we will advise on compatible alternatives before any order is confirmed.
Continue The Model Path
Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.