Fanuc A20B-2004-038 Control Card – Series 16/18/21
Fanuc A20B-2004-038 is listed for Series 16/18/21 RFQ review. Confirm quantity, condition and destination before quotation.
Model: AID16D A03B-0807-C104
Product Overview
Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.
Datasheet Preview
Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.
Commercial Path
Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.
Technical Dossier
| Part Number | A03B-0807-C104 |
| Model | AID16D |
| Brand | FANUC |
| Function | 16-Channel Analog Input Module |
| Compatible Series | FANUC Series 16 / 18 / 21 CNC |
| Signal Type | Analog DC Input |
| Country of Origin | Japan |
| Condition | New / Refurbished (Tested) — specify on RFQ |
| Inventory Status | RFQ availability review — Sourced on Demand |
| RFQ terms review | Commercial terms are confirmed during RFQ review based on model, condition, documentation, quantity and destination. |
| Condition review | Available condition, photos, test records and documentation are checked before quotation according to the requested model. |
| Minimum Order Quantity | 1 Unit |
Spare Parts Turnover Rate: For high-utilization CNC environments (2–3 shifts/day), industry benchmarks suggest maintaining at least one AID16D spare per 4–6 active controllers. Procurement teams that treat this as a consumable line item — rather than a reactive purchase — consistently report 30–45% lower emergency sourcing costs over a 3-year horizon.
We are not a catalog reseller. DriveKNMS operates as a specialist industrial component sourcing firm with direct access to FANUC legacy inventory across Asia-Pacific, European, and North American secondary markets.
Q: How are RFQ terms confirmed?
A: Quantity, required condition, documentation needs, destination and sourcing route are confirmed during RFQ review before quotation.
Q: Can you source this part if it is not available for RFQ review?
A: Yes. We operate on a sourcing-on-demand model. If the AID16D is not immediately available, we will provide a sourcing timeline within 24–48 business hours of your RFQ submission.
Continue The Model Path
Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.