Hollysys FM192-TR Active Terminal Module – HOLLiAS Series
Hollysys FM192-TR is listed for HOLLiAS Series RFQ review. Confirm quantity, condition and destination before quotation.
Model: K-AO01 K-AO01
Product Overview
Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.
Datasheet Preview
Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.
Commercial Path
Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.
Technical Dossier
| Part Number | K-AO01 |
| Manufacturer | Hollysys Automation Technologies |
| Series | HOLLiAS DCS |
| Module Type | Analog Output Module |
| Output Channels | 8 channels (4–20 mA / 0–10 V configurable) |
| Communication | Proprietary HOLLiAS backplane bus |
| Power Supply | 24 VDC (supplied via backplane) |
| Operating Temperature | 0°C to 55°C |
| Country of Origin | China |
| Condition | New / Refurbished (specify on RFQ) |
| Inventory Status | RFQ availability review — confirm availability on inquiry |
| RFQ terms review | Commercial terms are confirmed during RFQ review based on model, condition, documentation, quantity and destination. |
| Minimum Order Quantity | 1 unit |
If your facility is evaluating whether to maintain HOLLiAS DCS infrastructure versus migrating to a newer platform, the K-AO01's per-unit cost is typically far below the engineering and commissioning cost of a control system migration. Extending asset life by 3–5 years with genuine spare parts is a defensible capital deferral strategy.
Q: How are RFQ terms confirmed?
A: Quantity, required condition, documentation needs, destination and sourcing route are confirmed during RFQ review before quotation.
Q: Do you ship to sanctioned countries or regions?
A: No. All exports comply with applicable Chinese export control regulations and international trade compliance requirements. End-user declarations may be required for certain destinations.
Continue The Model Path
Move from this exact model into the matching system hub, brand archive, model-family archive or lifecycle sourcing route before sending a final RFQ list.