Sanken DK14256A Circuit Board: Specifications, Compatible Models & Availability
Sanken DK14256A Series: Comprehensive Module Range and Technical Overview The Sanken DK14256A is a purpose-built circuit board module deployed across…
Model: 0240-20592 2214-25ML 0190-12138 PV2A015SMT1P50-1
Product Overview
Commercial availability is handled through direct RFQ, model verification and export-oriented follow-up rather than public cart checkout.
Datasheet Preview
Use attached product manuals when available. If the manual is not public yet, request the full file directly through RFQ.
Commercial Path
Product pages on DRIVEKNMS are designed to verify model, brand and series first, then move the buyer into one clean quotation path.
Technical Dossier
The Applied Materials PV2A015SMT1P50-1 PVD Chamber Integration Kit (P/N: 0240-20592 / 2214-25ML / 0190-12138) is a critical consumable assembly used in Physical Vapor Deposition (PVD) process chambers — a cornerstone of semiconductor wafer fabrication, flat-panel display manufacturing, and advanced thin-film coating lines. As Applied Materials has transitioned this kit through product lifecycle stages, procurement managers face a narrowing window to secure authentic, traceable inventory before the market dries up entirely. This page is designed to give you the sourcing intelligence you need — not a sales pitch.
| Manufacturer | Applied Materials (AMAT) |
| Part Numbers | 0240-20592 / 2214-25ML / 0190-12138 / PV2A015SMT1P50-1 |
| Description | PVD Chamber Integration Kit |
| Application | Physical Vapor Deposition (PVD) process chambers — semiconductor fab, thin-film deposition |
| Country of Origin | United States |
| Product Status | Discontinued / End-of-Life (EOL) — limited authentic stock available |
| Condition | New / Surplus New (OEM-equivalent traceability upon request) |
| Lead Time | 3–15 business days depending on stock location and destination |
| Minimum Order Quantity | 1 unit (bulk pricing available for 3+ units) |
| Inventory Status | Limited — subject to prior sale; confirm availability via RFQ |
| Export Compliance | Full commercial invoice, packing list, and ECCN classification available |
For procurement managers evaluating the Total Cost of Ownership (TCO) of PVD chamber maintenance, the integration kit is rarely the largest line item — but it is frequently the one that causes the most expensive unplanned downtime. A single unscheduled PVD chamber outage in a high-volume fab can cost $50,000–$200,000+ per day in lost wafer throughput. The math is straightforward: paying a premium for a verified, in-stock kit is almost always cheaper than waiting 8–16 weeks for an OEM backorder.
Where DriveKNMS reduces your TCO:
We are not a catalog distributor. DriveKNMS operates as an industrial spare parts sourcing specialist with a focus on hard-to-find, EOL, and long-lead-time components for capital equipment in semiconductor, oil & gas, steel, and power generation industries.
Q: What are your payment terms?
A: Standard terms are 100% T/T in advance for first-time orders. Net-30 terms available for established accounts with credit approval. We also accept PayPal and major credit cards for orders under USD 5,000.
Q: What is your warranty policy?
A: 12 months from date of shipment. Defective units are replaced or refunded at our discretion. Warranty does not cover damage from improper installation or use outside of specified parameters.
Q: Do you offer bulk or volume discounts?
A: Yes. Orders of 3+ units receive preferential pricing. Contact us with your quantity and target price for a formal quotation.
Q: What is your return policy?
A: Returns accepted within 30 days of receipt for unused, unopened units in original packaging. RMA authorization required. Return shipping costs are the buyer's responsibility unless the item is defective.
Q: Can you provide a certificate of conformance or test report?
A: Yes, upon request and subject to availability from the supply source. Please specify your documentation requirements in your RFQ.
Q: How do I know the stock is authentic?
A: We provide full supply chain traceability documentation. For high-value orders, third-party inspection can be arranged prior to shipment.